Request a call
(048)738-01-02
Request a call

Find out the price

Name:*
We will call you back at a convenient time.:

Thank you, application accepted

Construction progress

Art Kvartal:

Completion of piles in section 1. Work is underway to arrange wells (5 of 9 wells have been completed). Groundwater is pumped out of three wells.

Planned completion time - 3 quarter of 2021.

Section 1

Construction:

Land works - 28%
Work to waive 0 - 10%
Frame - 0%
Brickwork - 0%

Improvement:

Facade:

Networks:

Webcam

Photos from the construction:

Watch report
Watch report
Watch report
Watch report
Watch report
Watch report
Watch report

The ART KVARTAL is a major project of the revitalization of the territory of the Odesa Ship-Repair Yard into a multifunctional neighbourhood: for life, networking, communication, leisure and business. Photos from the construction site are being published regularly, and you can see them in your spare time.

Along Marinesko Descent, which is included in the protection zone, the height of the buildings will be limited to four floors. The architectural highlights of the ART KVARTAL City Space will be two 23-story buildings located along Prymorska Street. Investors can monitor the construction progress, analyse the pace of work, control the compliance of the planned and actual characteristics of the facility.

What is important to know about ART KVARTAL City Space

The multifunctional neighbourhood is being built in the heart of Odesa. It takes 5 minutes to get to Derybasivska Street by car.

The real estate class is "comfort +". The cast-in-place concrete frame technology is being used in construction. High-quality thermal insulation is provided by mineral wool. It has its own boiler room, which will allow to regulate temperature in the apartments and prevent interruptions with hot water.

The play club and child development centre, art spaces and coworkings, restaurants and cafes, fitness centre, street food market are important infrastructure within the ART KVARTAL City Space.